Latest Activity

Christine Clifford posted a discussion
Tuesday
Yuriko Nakano posted an event

Free event: SWORDS Showcase - Hypnotic Spoken Words from Romania at Barbican Library

March 14, 2024 from 6pm to 7pm
Mar 5
An event by GLE Website Comms Team was featured
Thumbnail

Differently Various Art Exhibition at different spaces

March 5, 2024 to April 7, 2024
Mar 5
GLE Website Comms Team posted an event
Thumbnail

Variously Different Art Exhibition at different spaces

March 5, 2024 to April 7, 2024
Mar 5

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London

COLPAI Project Weekly Work Update – W/C Monday 24 February

Dear Neighbour
 
Please see below activities relating to the COLPAI Project, which are due to take place from Monday 24 February. 

Monday 24 February - Friday 28 February 
Works will include:

  • Reduce level dig and backfilling to the residential area
  • UXO probing to the residential area
  • Concrete pour to the southern residential area
  • Groundworks and concrete pour to school area
  • Excavators filling muck away lorries
  • Asbestos watching brief
  • Air quality monitoring
  • Environmental monitoring.

Saturday 29 February & Sunday 1 March

  • No works

 Notable Points

  • Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive 
  • An environmental air analyst will be present to monitor the site during works. 

On-site security

  • Security Guard now on-site full time 7.00am – 6.30pm
  • CCTV Security cameras are now monitoring the site 24 hours a day, 7 days a week.

Deliveries

  • Muck-away and stone lorries
  • Pit lane on Golden Lane is now operational for lifting materials by crane into the site.

Non-ISG Works

  • Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site. 

Working Hours
 
Monday to Friday 08:00 to 18:00
Saturday 9:00 to 14:00
 
Consented Reduced Impact Hours
During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery.
 
Monday to Friday 10:00 to 12:00 and 14:00 to 16:00
 
Noise, dust and vibration monitoring is in place. 
 
For site emergencies, please contact:
 
Steven McCarthy, ISG 
T: 07825 719 496
Stephen Beattie, ISG 
T: 07816 418 156