Latest Activity

Sheila replied to Sam's discussion Looking for studio / 1 bed to rent
yesterday
Sam posted a discussion
Saturday
An event by Paul Lincoln was featured

Imagine Golden Lane and Community Cafe next Saturday at Under Crescent House

April 27, 2024 from 2pm to 4pm
Saturday
Paul Lincoln posted an event

Imagine Golden Lane and Community Cafe next Saturday at Under Crescent House

April 27, 2024 from 2pm to 4pm
Saturday

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London

COLPAI Project Weekly Work Update – W/C Monday 27 January

Dear Neighbour
 
Please see below activities relating to the COLPAI Project, which are due to take place from Monday 27 January. 
 
Monday 27 January - Friday 31 January
Works will include:

  • Reduce level dig and backfilling to the residential area
  • Groundworks and concrete pour to the southern residential area
  • Groundworks and concrete pour to school area
  • Excavators filling muck away lorries
  • Asbestos watching brief
  • Air quality monitoring
  • Environmental monitoring.

 
Saturday 1 February – Sunday 2 February

  • No works.

 Notable Points

  • Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive 
  • An environmental air analyst will be present to monitor the site during works. 

On-site security

  • Security Guard now on-site full time 7.00am – 6.30pm
  • CCTV Security cameras are now monitoring the site 24 hours a day, 7 days a week.

Deliveries

  • Muck-away and stone lorries
  • Pit lane on Golden Lane is now operational for lifting materials by crane into the site.

Non-ISG Works

  • Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site. 

Working Hours
 
Monday to Friday 08:00 to 18:00
Saturday 9:00 to 14:00
 
Consented Reduced Impact Hours
During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery.
 
Monday to Friday 10:00 to 12:00 and 14:00 to 16:00
 
Noise, dust and vibration monitoring is in place. 
 
For site emergencies, please contact:
 
Steven McCarthy, ISG 
T: 07825 719 496
Stephen Beattie, ISG 
T: 07816 418 156