Latest Activity

Christine Clifford posted a discussion
Tuesday
Yuriko Nakano posted an event

Free event: SWORDS Showcase - Hypnotic Spoken Words from Romania at Barbican Library

March 14, 2024 from 6pm to 7pm
Mar 5
GLE Website Comms Team posted an event
Thumbnail

Variously Different Art Exhibition at different spaces

March 5, 2024 to April 7, 2024
Mar 5
GLE Website Comms Team posted an event
Thumbnail

Pets Policy Consultation at Sir Ralph Perring Centre

March 5, 2024 from 5:30pm to 7pm
Mar 4

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London

COLPAI Project Weekly Work Update – W/C Monday 27 May 2019

Dear Neighbour

Please see below activities relating to the COLPAI Project, which are due to take place from Monday 27 May 2019. 

Monday 27 May

  • Site closed for Bank Holiday.

Tuesday 28 May- Friday 31 May

Works will include:

  • Excavation and removal of obstructions in the ground
  • Asbestos watching brief and removal
  • Demolition material being removed from site
  • Air quality monitoring
  • Environmental monitoring.

Saturday 1 June – Sunday 2 June

  • No works.

Notable Points

  • Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive
  • An environmental air analyst will be present to monitor the site during works.

CCTV on site

  • For additional security, ISG has installed a CCTV monitoring system. The site is monitored 24 hours a day, seven days a week. This system is only active within the site boundary and cannot be directed outside the boundary lines.

Deliveries

  • Muck-away lorries.

Non-ISG Works

  • Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site. 

Working Hours

Monday to Friday 08:00 to 18:00

Saturday 9:00 to 14:00 

Consented Reduced Impact Hours

During reduced impact hours, works will still take place on-site, however, works will not involve percussive machinery or other similar construction involving heavy machinery.

Monday to Friday 10:00 to 12:00 and 14:00 to 16:00

Noise, dust and vibration monitoring is in place.

For site emergencies, please contact:

Steven McCarthy, ISG

T: 07825 719 496

Stephen Beattie, ISG

T: 07816 418 156

Views: 41

Reply to This

© 2024   Created by Paul Lincoln.   Powered by

Badges  |  Report an Issue  |  Terms of Service