Latest Activity

Sheila replied to Sam's discussion Looking for studio / 1 bed to rent
yesterday
Sam posted a discussion
Saturday
An event by Paul Lincoln was featured

Imagine Golden Lane and Community Cafe next Saturday at Under Crescent House

April 27, 2024 from 2pm to 4pm
Saturday
Paul Lincoln posted an event

Imagine Golden Lane and Community Cafe next Saturday at Under Crescent House

April 27, 2024 from 2pm to 4pm
Saturday

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London

COLPAI Project Weekly Works Update - Monday 2 September 2019

Dear Neighbour

Please see below activities relating to the COLPAI Project, which are due to take place from Monday 2 September 2019.

Monday 2 August - Friday 6 September
Works will include:

  • Breaking out hardstanding concrete along Golden Lane
  • Work on the Golden Lane footpath to install access crossover
  • Installation of a temporary heras fence hoarding along Basterfield Service Road
  • Instillation of temporary heras fence hoarding along Hatfield House and Baltic Street 
  • Removal of obstructions in ground
  • Lorries bringing backfill material into site
  • Excavators filling muck away lorries
  • Asbestos watching brief
  • Air quality monitoring
  • Environmental monitoring.

Saturday 7 September - Sunday 8 September

  • No works.

Notable Points

  • Asbestos removal works are being carried out in-line with guidance from the Health and Safety Executive  
  • An environmental air analyst will be present to monitor the site during works
  • Works on the Golden Lane footpath will result in one section of the footpath being closed, with traffic management in place
  • Basterfield Service Road - access for emergency vehicles will be clear at all times
  • Access to Hatfield House bin store will be clear at all times

 
CCTV on site

  • For additional security, ISG has installed a CCTV monitoring system. The site is monitored 24 hours a day, seven days a week. This system is only active within the site boundary and cannot be directed outside the boundary lines
  • A security guard is now on-site everyday between 7.00am - 6.30pm.

 
Deliveries

  • Muck-away lorries.

 
Non-ISG Works

  • Road sweeper in place to clean Golden Lane following the muck-away lorries leaving the site.

 
Working Hours
Monday to Friday 08:00 to 18:00
Saturday 9:00 to 14:00
 
Consented Reduced Impact Hours
During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery.
Monday to Friday 10:00 to 12:00 and 14:00 to 16:00
 
Noise, dust and vibration monitoring is in place. 
 
For site emergencies, please contact:
 
Steven McCarthy, ISG 
T: 07825 719 496
Stephen Beattie, ISG 
T: 07816 418 156