Please see below activities relating to the COLPAI Project, which are due to take place from Monday 18 May 2020.
 
Monday 18 May – Friday 22 May

ISG works will include:
  • Construction of reinforced concrete superstructure to new school building
  • Construction of further welfare on the ground floor of the school, including Structural Steel Framing System (SFS) for the external walls
  • Construction of slab to the new school hall
  • Excavation to the residential block
  • Part excavation for the residential block
  • Continuation of ground works and drainage
  • Construction of capping beam for the residential building.
Works are not scheduled to take place on Saturday 23 May.
 
Deliveries 

Deliveries taking place throughout the week include:
 
• Removal of excavated spoil from the site
• Concrete to the site.
 
ISG On-Site Security 
 
• Security guard on-site full time 7am – 6.30am
• CCTV security cameras are now monitoring the site 24 hours a day, 7 days a week.
 
The City of London also has CCTV monitoring of the site in place.
 
Working Hours 
Monday to Friday – 8am to 6pm
Saturday – 9am to 2pm
 
Consented Reduced Impact Hours 
 
During reduced impact hours, works will still take place on-site. However, works will not involve percussive machinery or other similar construction involving heavy machinery.
 
Monday to Friday 10am to 12pm and 2pm to 4pm
 
Noise, dust and vibration monitoring is in place. 
 
For site emergencies, please contact:
Steven McCarthy, ISG 
 
T: 07825 719 496

Views: 18

Reply to This

© 2024   Created by Paul Lincoln.   Powered by

Badges  |  Report an Issue  |  Terms of Service