Latest Activity

Christine Clifford posted a discussion
Tuesday
Yuriko Nakano posted an event

Free event: SWORDS Showcase - Hypnotic Spoken Words from Romania at Barbican Library

March 14, 2024 from 6pm to 7pm
Mar 5
An event by GLE Website Comms Team was featured
Thumbnail

Differently Various Art Exhibition at different spaces

March 5, 2024 to April 7, 2024
Mar 5
GLE Website Comms Team posted an event
Thumbnail

Variously Different Art Exhibition at different spaces

March 5, 2024 to April 7, 2024
Mar 5

Facebook

There are four Golden Lane Estate related facebook accounts and you can follow them here: goldenlaneEC1 

Golden Lane Estate / RCS site 

Save Bernard Morgan House

City of London

As far as I can establish the estate was last redecorated in 2005. By next summer that will be 13 years. A normal cycle of redecoration would be 7 years. The paint is literally falling off Basterfield House. Here are the little deposits of paint all along Basterfield Mews that we woke up to this morning, caused by water freezing under the paint surface and blowing it off.

Over one third of the concrete repair bill is for "access". Apparently the concrete repairs will be carried out by abseiling (without scaffolding). There would be no need for the cost of abseiling if the concrete repair and the redecorations were carried out this summer and at the same time.

According to the last Major Projects Update from September: "Post- tender consultation with leaseholders is due to be carried out in December and we hope that work will start on site in February 2018."  I have not received any consultation on redecorations. Is this project on schedule?

Views: 183

Attachments:

Reply to This

Replies to This Discussion

Hi Charles,

A full redecoration of the outside of all the blocks has not been carried out since I moved here in 2002. On Hatfield the inside of the private rear balconies and the front doors was painted over 5 years ago and i seem to remember the exterior of one block being painted a pale grey about the same time.

The City claim that this has no connection to the determination of the concrete but as the are also saying that the concrete did not have accelerants that damage the reinforcement then the damage must be from water penetration.